hero-image

Recent Jobs (case studies)

Wellington Chiller Replacement

For:  Advanced Building Services (ABS)

At: HSBC Tower , 195 Lambton Quay, Wellington Central.

Utilising the Liebherr LTM1350-6.1 Crane with 50t of counterweight (65.6M main boom with Y-guy and 48m luffing fly jib attachment) at a working radius of 32m.

Read more....

HSB Tower Chiller Lift

Wellington Hospital - temporary ward on the roof

For: Naylor Love

At: Wellington Hospital

The project involved building a temporary ward (“decant” ward) on the hospital roof so that contractors can replace copper pipes in the existing wards at Wellington Hospital.

Prefab Pods: Eight prefabricated pods, each measuring 7m x 7m x 3.5m and weighing 14.5 tons, were built offsite in Upper Hutt by Naylor Love. These pods were designed to serve as the temporary ward.

Read more....

Wellington Hospital decant ward